Tamale Water Supply Expansion
TAMALE WATER SUPPLY EXPANSION, REHABILITATION AND OPTIMIZATION PROJECT
Client: Ghana Water Company Limited
Location: TAMALE
Status: Completed
Under this project, the contractor, Biwater Contracting B. V. provided the following:
- New raw water intake pumps and raw water pipeline
- Constructed an additional 25,000 m3/day water treatment plant
- Constructed a new transmission pipeline
- Adapted the existing 450 mm transmission pipeline for distribution supply to the corridor villages
- Increased the distribution network and storage facilities
- Implemented a metering and water asset management programme
Undertook training and institutional strengthening at Ghana Water Company Limited, Tamale.