• . info@adk-consortium.com
  • . +233 302 229 104

Kotoka International Airport New Terminal Building Project


Client: Government of Ghana
Location: ACCRA
Status: On-going

 

This Project is to carry out and complete geotechnical investigation and topographical survey work for the new International Terminal Building.

 

The required Geotechnical investigation campaign is being performed at location of Terminal 3 Building, CIP Building and VIP Building; Landside Roadways, Car Park and Bridges

 

 

The Topographic Survey Work for the new Terminal Project area including road and all utilities (natural features, man-made features and infrastructure) covers the following:

  • Provide topographic survey supported by detailed, profile, plans
  • drawings which show all features and utilities.
  • Provide surveying and mapping services in support of The CLIENT’s design, construction activities associated with Project limit

List of some of our completed Drainage & Infrastructure   projects;

  • 16-storey Office complex at Ridge, SSNIT
  • 9-storey Office complex at Farrar Avenue, SSNIT
  • Regional Office Building at Bolgatanga, SSNIT
  • District Office at Tema Town Centre, SSNIT
  • Office Block, Ministry of Trade, Private Sector and PSI
  • Maritime House at Boankra, Ghana Shippers Council
  • Regional Office Building at Cape Coast, SIC
  • Regional Office Building at Kumasi, SIC
  • Regional Office Building at Tamale, SIC
  • Office Complex at Ridge, Post Graduate College of Physicians & Surgeons

Project Pictures (2)